Projects

Electrical contractors Sheffield

Little Greene Richmond (London)

Opened August 2022, CS Electrical working with Formm completed the shop fit out of Little Greene in Richmond. We installed and commissioned a new Schneider DB complete with RCBO protection, partial re-wire, new LED lighting through out, new air-conditioning, new CAT6 data network and comms cabinet. The client was delighted with the overall finish and how aesthetically pleasing it is on the eye.  This is the second project for Little Greene we have delivered with Formm, having also worked on the Little Greene Islington store in 2020.

 

 

 

Electricians Sheffield

Evolution Power Tools Head Office (Sheffield)

Completed April 2022, CS Electrical working with Formm, successfully delivered the fit out and renovation of Evolution Power Tools Head Office in Sheffield. We installed and commissioned the small power, lighting and data network for the management offices, board room, directors office, kitchen and meeting rooms. This project was completed to programme and within budget. The client was delighted with the high standard of the finished project.

 

 

 

 

Electrical Contractors Leeds Hospital

Leeds Children’s Hospital

Completed October 2021, CS Electrical working with Balfour Beatty on behalf of NG Bailey installed and commissioned the new Electrical systems for the entrance of the Clarendon Wing of The Leeds Children’s Hospital. The Leeds Hospital Charity wanted to transform the entrance to make it bright and welcoming to the children. We installed the supplies to the new Starlight immersive experience interactive screens as well as the new lighting and power to the reception desk. Great care was taken on this project as it was a fully operational hospital and we had to work in phases to minimise disruption to the patients, public and staff. The project was a great success and the Leeds Hospital Charity was delighted with the results and commended all the contactors involved for delivering a fantastic project for the children. Please watch https://youtu.be/VIGoMG8uqdI for more details.

 

Arc Flash Study

Arc Flash Survey’s (European Wide)

Since 2018, CS Electrical has been in partnership with Electrical Safety UK (ESUK) providing support with Arc Flash Surveys. Electrical Safety UK are the country’s leading consultants in Arc Flash Management, Risk Assessment, and training.

Our role for the Arc Flash Survey is to provide onsite Data Collection on the Electrical System from the incoming HV Switchgear down to 100A fuses or 63A MCB supplied three phase circuits, utilising Easypower Onsite Software. The Onsite file is then uploaded to the desktop Easypower Software for calculation of Arc Flash levels at each point throughout the electrical system.

We have completed over 60 projects to date for Blue Chip international companies around Europe and the UK for Power Stations, Aerospace, Steel Works, Manufacturing and Pharmaceutical industries. We continue to remain a trusted partner with ESUK and collaborate to provide an excellent service in this field.

 

 

Electricians care homes

Care Homes (Yorkshire)

In 2020 and early 2021, at the height of the Covid 19 Pandemic, CS Electrical, supporting Datamills, installed Data networks in Care Homes around Yorkshire to give the residents improved Wi-Fi access to enable them to communicate with family via video calling. This project involved new data cabinets, patch panels, Cat5e cabling, power supplies, containment, and access points. We have installed this system in over 14 care homes to date since 2010. These projects can often be challenging environments to work in due to the nature of the buildings and great sensitivity towards the residents always being required. Due to the Covid 19 Pandemic great care was required to follow social distancing guidelines to mitigate risk to all the residents. CS Electrical continue to be selected to work in these environments due to our diligence to health and safety and respect towards the residents.

 

 

 

 

electricians chesterfield

Carphone Warehouse (Chesterfield)

In 2021, CS Electrical working with Formm on behalf of Landsec, completed the safe strip out of all services back to source of the redundant Carphone Warehouse unit. This unit is intended to be a new Costa Coffee. Our part of the project was a success, completed ahead of programme and on budget. High Health and Safety standards were maintained throughout and Covid 19 social distancing guidance upheld.

 

 

 

 

 

 

electricians Sheffield

The University of Sheffield Covid 19 Testing Facility

In 2020, at the height of the Covid 19 pandemic, CS Electrical working with NG Bailey and BAM Construct, was instructed to help build The University of Sheffield’s Covid 19 asymptomatic testing facility in the Octagon Centre. This was a short notice project in reaction to the fast pace of the pandemic with all trades working around the clock to complete the facility within 5 days. Strict Covid 19 social distancing guidance measures were maintained, and health and safety standards upheld. The facility includes 44 individual testing bays, storage rooms, and the hand wash station which was built offsite and installed by CS Electrical.

 

 

 

 

 

electrical testing of hazardous locations

Sulphur Processing Plant (South UK)

In 2020, CS Electrical carried out a full Electrical Safety inspection of a Sulphur Processing Plant located in the South of the UK for an international company. This site is a Compex installation and an extremely explosive environment, so it is imperative that all the electrical systems are checked on a regular basis by competent qualified electricians. We carried out a full Electrical Installation Condition Report (EICR) with 100% testing and inspection, Arc Flash survey data collection and co-ordination study. On completion CS Electrical issued the client with a comprehensive user-friendly remedial report detailing our findings on the site and recommendations to bring the installation up to satisfactory standards. We upheld our high health and safety practices during this project and given the nature of the hazardous working environment with the sulphur dust, special PPE was always worn as well as cleaning hands and skin at regular intervals. We also adhered to the Covid 19 social distancing guidance.

The client was extremely happy with the high level of service that we provided, and it gave them peace of mind that the safety of the installation could be upheld.

 

electricians london

Little Greene (Islington London)

In 2020, CS Electrical working with Formm, carried out the shop fit out for Little Greene’s new store in Islington London. This project involved altering the existing small power and lighting to suit the new shop layout. This fit out was hugely successful, particularly for a business in which it is imperative that everything is aesthetically pleasing. The end result by all parties involved was an absolutely stunning contemporary new store in an affluent area of Islington. Our part of this install was delivered on time and within budget. Strict Covid 19 social distancing guidance were adhered to and high levels of health and safety practices were maintained.

 

 

 

 

 

Fixed wire testing

United Utilities Head Office (Lingley Mere Warrington)

In 2019 and early 2020, CS Electrical supporting Emcor, carried out (20% each year) Periodic Electrical Testing on behalf of United Utilities in Lingley Mere business park. This is United Utilities head office, water testing laboratories and business park which comprises of thousands of square meters of workspace. CS Electrical carried out the periodic electrical inspection and testing which comprises of over 185 main panels and distribution boards in Clearwater 2, Grasmere, Haweswater, Ullswater, Security Lodge, Reception buildings and car park lighting feeder pillars. Most of these works were carried out using two teams working out of hours on nights in co-ordination with the client and were completed on programme and within budget.

 

 

 

 

medical electrical contractors

Seqirus Vaccines (Speke Liverpool)

CS Electrical has been supporting Emcor in providing Electrical installation and maintenance services at Seqirus Vaccine manufacturing plant in Speke Liverpool since 2019. We have carried out the fixed wire electrical testing (EICR) and thermographic survey of the upstream, downstream of the processing plant as well as the service maintenance areas. Due to the nature of the building manufacturing medical vaccines, extremely high health and safety practices are always upheld and extensive PPE worn in the manufacturing areas to avoid contamination. We have carried out numerous installations and are involved in the new Solite SmartScan LED lighting upgrade which will save thousands of pounds a year in maintenance costs. This at times can be a challenging area to work and we continue to be called upon for our services because we provide the high standards that are expected.

Electricians SheffieldBreast Cancer Now (Sheffield)

In 2019, CS Electrical working with Formm, successfully completed the fit out of the new office suites on behalf of Breast Cancer Now in St James House Sheffield. This project involved new distribution boards with shutdown, lighting, power, containment modifications to suit the new layout and new air conditioning units. The project was completed on time despite a tight programme and within budget whilst maintaining high health and safety standards. The client was thrilled with the result and we have since returned to carry out other installations working directly for Breast Cancer Now.

 

 

 

 

 

Peak Indicators (Chesterfield)

electricians chesterfield

 

In 2019, CS Electrical working with Formm, delivered the complete new fit out of Peak Indicators offices at Hayfield House Chesterfield. This project involved isolation, strip out, design, new containment, Electrak busbar, floor boxes, re-wire of small power / lighting, new LED lighting, air conditioning, fire alarm, data, new comms room, security, door access, testing and O&M’s. This project was a huge success and it was a pleasure to work efficiently with a great team of trades while upholding high health and safety standards. We have since been involved in other projects working directly for Peak Indicators.

 

 

 

 

 

Electrical contractors Sheffield, Electricians Sheffield

Project Cavendish Sheffield

In 2018/2019 CS Electrical, working with BAM and NG Bailey successfully delivered Project Cavendish in Sheffield City Centre. This 90 million pound building in the first phase of Sheffield’s new retail quarter and regeneration of the city will house HSBC’s new offices, Sheffield City Council offices and new retail units. CS Electrical was delighted to be involved on this project in our home City and we are excited for the next phases to come.

 

 

 

 

American Express Hamburg Germany

Electrical contractors europe, electricians europe, electrical testing europe

 

In 2018, we flew to Hamburg with our tools and kit to undertake the inspection and testing for American Express in one of their offices. CS Electrical was chosen as they required a competent electrical contractor from the UK to ensure the electrical infrastructure was in a safe working condition and their vital operations would not be compromised. This was a great project to be involved in and has led to more opportunities for CS Electrical to work internationally. We have since tendered for a separate contract for 28 sites worldwide in 2019 for a large aerospace company.

 

 

 

 

Electricians Yorkshire, Electrical contractors sheffield

Engie (Formally Keepmoat) Main Office Wath-upon-Dearne

 

In 2017/2018, CS Electrical working for Engie successfully delivered the electrical fit out of their new Wath office.  The works included  new electrical supplies to feed the plant room, new supplies for the air conditioning system, electrical fit out of the office spaces and alteration to the fire alarm system. This project was completed to our usual high standards and was coordinated to a tight programme. We have continued to be one of Engie’s preferred suppliers building on the success of this project.

 

 

 

 

Greene King Pubs

Electrical testing of pubs, periodic inspection and testing of pubs, electricians pubs

 

In 2018, CS Electrical working with Test Inc carried out the framework contract in Greene King pubs nationally. This contract involved periodic inspection and testing of the pubs electrical installations and undertaking remedial works to ensure the electrical installation continues to be safe and conforms to BS7671.

 

 

 

 

 

 

NGB Direct Projects/Facilities

 

Since 2014, CS Electrical have been a preferred supplier to NG Bailey’s Direct Projects and facilities division. CS Electrical have successfully completed many projects dealing directly to the client in the retail sector. These projects include periodic inspection and testing at J32 Shopping Outlet, the renewal of car park lighting feeder pillars after flood damage at Cardigan Fields Shopping Centre and the installation of JC Decaux media screens at Trinity Shopping Centre Leeds. These projects are normally at short notice and rapid response working mainly out of hours. CS Electrical’s cleanliness and safety to the public are paramount in these projects.

 

 

 

 

Sainsbury’s Rollout 605 Superstores

Electricians Nationwide, Signstix, Toshiba

In September 2017, we completed the Roll out of Sainsbury’s new SignStix delivery system. Working with Toshiba and Conceptunet we had multiple teams installing throughout England, Scotland, Wales and Northern Ireland in each of the 605 superstores. This project involved safely removing the old Isotrak system, installing new power supplies, mounting the new smart screens and commissioning them with the latest SignStix software. High health and safety standards were maintained throughout this project. This Roll out was a huge success for everyone involved and Sainsbury’s was very satisfied with how this project was delivered.

 

 

 Bradford Royal Infirmary Hospital

 

Hospital electricians, Electrical contractors

 

 

In 2016, CS Electrical was awarded the contract for installing the new electrical services at Bradford Royal Infirmary Hospital working with NG Bailey and BAM Construction. The project formed part of a £28 Million new build hospital wing. We successfully installed all the electrical services and systems in the new Critical Care Unit which was completed in 2017 as well as working in other areas of the project. This project was challenging due to the nature of the build and adverse weather conditions, however we delivered this project to the programme whilst maintaining our high installation standards and dedication to Health & Safety.

 

 

 

 

Leeds University Worsley Building

Leeds University Electrical contractors, Leeds Electricians
Towards the end of 2015 and into 2016, CS Electrical working on behalf of NG Bailey Engineering and Overbury started installing new electrical systems to numerous areas of the Leeds University Worsley Building. This project had a contract value of £40 Million. We completed the new electrical systems on level 11 which comprises of office and teaching space along with the Plant-Room area. This project proved to be another success and we completed ahead of programme and within budget.

 

ASOS Main Distribution Centre BarnsleyFactory Electricians

In 2015, CS Electrical working with HE Barnes successfully delivered numerous projects for ASOS. The warehouse is the main distribution centre for the UK covering an area the size of six football pitches. The building has miles of Dematic automated picking systems and is always evolving to keep up with the continuing demand of online purchasing. We also recently installed the lighting systems and upgraded the power distribution for the new picking area on the top floor. CS Electrical completed this project ahead of programme and within the agreed budget whilst maintaining our usual high standards.

 

 

New Engineering Building (NEB) Sheffield University

Sheffield University Electrical Contractors Electricians

 

In 2014-2015, CS Electrical working on behalf of NG Bailey Engineering and Balfour Beatty Construction successfully delivered the New Engineering Building for Sheffield University. We installed the electrical systems for Levels 2 & 3 on the South side. These areas included Materials Laboratory, Lecture Theatres, Machine Room, Virtual Reality Suite, Mechanics Laboratory, Fluid Mechanics Lab and Communal Areas. This 19,500 m sq building also houses specialist engineering laboratories. It cost £81 million to build and is already an iconic building in the Sheffield skyline. We completed this project to an extremely high standard, ahead of programme and on budget. CS Electrical are extremely proud to have successfully delivered such a prestige project and we maintain our good working relationships with all parties involved in the build.

 

 

 

 

Huddersfield Leisure Centre

Leisure centre electricians, electrical contractors leisure centres

 

 

 

In 2014-2015, CS Electrical working with NG Bailey Engineering and BAM Construction successfully delivered the new Huddersfield Leisure Centre. This project was a £35 Million build and we installed the electrical systems for the Fitness Suite, Squash Courts, Climbing & Bouldering area and the Roof Plant-room. This was a great project to be involved with and they are fantastic facilities. We built great working relationships with colleagues on site and are continuing those relationships on other projects. We completed the project to a high standard, ahead of programme and within the agreed budget.

 

 

 

 Castlegate Road SuElectrical Contractors Lighting bway Lighting Huddersfield

In 2015, CS Electrical working on behalf of NG Bailey Engineering and BAM Construction, installed new subway lighting for Kirklees Council. We safely isolated and stripped out the old lights and installed new energy efficient LED, anti vandal light fittings. As this is an important existing pedestrian underpass system and a popular thoroughfare, this project was delivered in four stages to cause least disruption to the general public. We completed this project successfully on programme and within budget.

 

 

Vita Ventures (Old Telephone House) Student AccommodationStudent Accommodation Electrical Contractors

 

 

In 2014-2015, CS Electrical working with Genlec and Create Construction successfully delivered the refurbishment of the 15 storey BT Telephone House in Sheffield. The building was converted into 368 studios for student living. We installed the electrical services in the studios, the study hubs and leisure facilities of the building to a tight programme. We delivered the project in less than a year and within the agreed budget. The total build for this project was £16.5 Million.  We hope to work on more projects like this in the future.

 

 

 

Yorkshire Coast Homes (Preferred Contractor) Framework Agreement

Electrical Contractors YorkshireIn 2014, CS Electrical was successfully awarded Yorkshire Coast Homes Preferred Contractor. We entered a 3 year fixed term partnership framework agreement for the Electrical Works Improvement Programme. In 2017 the fixed term partnership framework agreement was extended for another year. YCH maintain and are responsible for over 4300 properties in the Yorkshire Coast area. These works are large housing renovations and community projects. These projects often involve working around vulnerable members of the community. We were selected as we take great care working on sensitive projects and work safely in these environments.

 

Leeds Trinity Shopping CentreLeeds Trinity Electrical Contractors, Shop Fitting Electricians

From 2014, we started providing our services on the Trinity Shopping Centre and City Exchange offices in Leeds for NG Bailey Facilities Services on behalf of Land Securities. We have carried out a large number of Electrical installs to the clients requirements. These range from new supplies and distribution boards to retail units, audio visual installations, new supplies in landlord areas and upgrading the lighting systems to energy efficient LED fittings. Most of these projects are carried out behind the scenes in the landlord areas or are out of hours to avoid any inconvenience to customers. We maintain a good working relationship with Leeds Trinity and Land Securities. We continue to deliver projects successfully on time and within budgets.

 

Winifred HoltbElectrical Contractors Hull, Electricians for School worky and Tweendykes School Hull

 

In 2014, CS Electrical working on behalf of NG Bailey Engineering for Morgan Sindall successfully completed numerous projects on Winifred Holtby and Tweendykes School. WH&T is Hull’s flagship school which was a multi million pound build. These projects were completed out of hours or during the school holidays to cause minimum disruption to the pupils. The photograph shows the new high level atrium lighting. This was installed to increase the lighting levels which were too low during the evening. We used a tracked Spider Lifter to reach the required height to ensure the wooden floor and underfloor heating was not damaged during our install. We delivered each project within the programme and on budget.

 

 

 

 

Rolls-Royce Advanced Manufacturing Research Centre SheffieldElectrical Contractors Sheffield, Factory Fit Out

In 2013, CS Electrical working with YPH and BAM provided the skilled labour to install the electrical services at the new Rolls-Royce Advanced Manufacturing Research Centre in Sheffield. This project was an extremely technical build and our team delivered it to a high standard and on time. We are very proud to have been involved with this iconic British brand.

 

 City Exchange Level 6 LeedsOffice Refurbishment, Office Fit Out, Electrical Contractors Leeds

 

In 2014, CS Electrical working on behalf of NG Bailey Engineering for Land Securities successfully completed the electrical fit out of an open plan office space on City Exchange in Leeds. We managed the project from start to finish, liaising and working with all trades to deliver the project on time and within budget. This project was a huge success and we formed great working partnerships with all involved which we still have to the this day.

 

 

 

British Telecom (Nationwide)electrical contractors with bt experience, telephone exchange electricians, electricians with bt experience

From 2006, onwards, CS Electrical working with Emcor Facilities Services has successfully completed over 1000 projects upgrading the infrastructure in BT’s Telephone Exchanges and Data Centres nationwide. The services we provide includes: Ironwork, Computer Racking, A.C Supplies, D.C Supplies, Project Management, Fibre Optic Cabling, LV Switch Panels, Inspection & Testing and General Electrical Installations. We deliver these projects on time, and within budget whilst maintaining our high standards of quality workmanship and health & safety. The installations we have completed are allowing BT and other internet providing companies to supply the nation with superfast fibre broadband.

 

 

electrical contractors with experience working with boots, electricians who have worked on boots, shop fitting electriciansBoots

CS Electrical working with Emcor and Mitel successfully installed new voice and data network systems into numerous Boots stores nationwide. As these were open stores often with the public present great care was taken to ensure that all health and safety practices were implemented at all times. Our friendly staff maintained our high standards of quality workmanship and cleanliness.

 

 

 

 

electrical contractors who have worked on supermarkets, electricians who have worked on supermarkets

Sainsbury’s Superstore

CS Electrical working with Carmel successfully completed the renovation of a Sainsbury’s Superstore in Beeston Nottingham. CS Electrical installed and commissioned part of the Electrical Infrastructure in the store. We delivered this project in line with the programme and at the agreed costs whilst maintaining our high standards of work and health & safety. CS Electrical has also delivered numerous other services nationally with success working in supermarkets for Sainsbury’s, Tesco, Asda and Morrison’s.

 

 

 

sheffield electrical contractors, sheffield electriciansAirmaster Projects

We have completed a number of projects working with Airmaster over the last decade. Starting with small jobs like providing fused spur outlets to supply fresh air units, to disconnecting main building supplies and providing safe isolation certificates for demolition companies at Sheffield Hallam University.

We have progressed to larger installs that require new three phase distribution boards to supply numerous air conditioning units at Irwin Mitchells head office in Sheffield, through to installing BMS systems in engineering companies to enable the systems to work safely and efficiently.We continue to have a great working partnership with Airmaster being their preferred electrical contractor.

 

 

 

electrical contractors sheffield, office refurb electriciansWandisco Offices

We were initially asked by Wandisco to complete their Portable Appliance Testing within their European head office in Sheffield. After making a great impression we were then asked to install new power and data requirements for the new communications room along with new floor sockets and Cat 5e data points to numerous desks within their expanding office. Together with AV installations we have provided an all round electrical package for Wandisco.

Shop fitting electrical contractors, shop fitting electriciansJumpin Jacks Diner (Whitby)

In 2012, CS Electrical successfully completed the shop refurbishment from an old charity shop into Jumpin’ Jacks Diner in Whitby. We Project Managed the renovation from start to finish co-ordinating all the trades and ensuring that the installation was completed on time, within budget and that high standards of work and health and safety were maintained at all times. We designed, installed and commissioned new Electrical, Fire Alarm, Emergency Lighting, CCTV, Security, Audio Systems and Voice & Data systems. The client is delighted with the service we provide and we continue to be the preferred contractor working on projects within their other businesses.

Prospeindustrial electrical contractors, electricians who fit machinery, electrical contractors rotherhamc

 
Since 2009, we have been providing both planned and reactive maintenance for Prospec in Rotherham. From Portable Appliance Testing in their factory and offices through to new 3 phase distribution boards to power large computer controlled machinery on the shop floor. We also provide off site Portable Appliance Testing for Prospec for their labour force around the UK. Since 2014 CS Electrical has been responsible for carrying out the periodic inspection and testing of the fixed wiring at their head office/factory.

 

 

electrical contractors who work with charity projects, electrical maintenance contracts sheffieldHillsborough Arena (Sheffield)

Since 2006, CS Electrical has been the preferred contractor for Hillsborough Arena which is a community project. We provide them with an ongoing electrical maintenance programme and have successfully completed numerous electrical installations in their buildings and all weather sports pitches. We periodically test and inspect their electrical equipment and fixed wiring. We are proud to be working with a community project and they know that we are a contractor they can trust.

 

 

 

electrical contractors who work on schools, electricians who work on schools

Stradbroke Primary School (Sheffield)

In 2013, CS Electrical, working directly for both Stradbroke School and Sheffield City Council have successfully completed numerous installs within the schools premises. We have installed new electrical supplies, carried out electrical maintenance works and installed their new fire alarm system. All our operatives on site held valid DBS checks and ensured that high standards of work and health & safety practices were evident at all times. We are constantly working on Sheffield schools and remain one of Sheffield City Council’s preferred contractors.

 

electrical maintenance contracts, office electricians

Electric Works (Sheffield)

Since early 2013, we have been providing planned and reactive maintenance for Electric Works Offices in Sheffield. From re-lamping lights in general areas to maintaining complicated lighting control systems and from planning emergency lighting tests to providing bespoke light fittings, we have the full range of electrical maintenance covered for Electric Works.

 

 

 

 

Asda SuperstoreShop fitting

CS Electrical in 2013, working with Nuttalls and Elecomm we successfully delivered the shop fit out of the George clothing department at the Asda Superstore in High Wycombe as part of the George 21 projects.  CS Electrical removed existing then installed and commissioned the new electrical lighting tracks, till supplies, lights and small power in the George area. We delivered this project in line with the programme working nights and long days, at the agreed costs whilst maintaining our high standards of work and health & safety and working in coordination with all the other trades. This project was a huge success and we are looking forward to working on more of these projects in 2014.

 

 

Ikea Superstore

Shop fitting electrical contractors, till supplies

CS Electrical in 2013, working with Ikea and Elecomm we successfully installed new cable basket and new till supplies in the Ikea Birmingham (Wednesbury) store. We carried out these works on nights in the store coordinating with the other trades and working safely around the Ikea night staff. We delivered this project in line with the programme, at the agreed costs, whilst maintaining our high standards of work.

 

 

 

 

 

H Harrold & Sons Locksmiths (Sheffield)Harrold-and-sons-locksmiths-logo

CS Electrical has been H Harrolds & Sons preferred Electrical Contractor for many years now. We have successfully delivered numerous installs at H Harrold’s which included upgrading there lighting in the shop and workshops, installing new lighting, small power and data in the offices, upgrading the mains distribution board and periodic inspection and testing of there fixed electrical installation. We have also installed numerous installations on behalf of H Harrold’s on there various sites. We deliver all these projects on time, at the agreed costs, to high standards of work whilst adhering to all good Health & Safety practices.